Ecuador
Country: Ecuador
Document type: National Roadmap
Title: Roadmap for Green Hydrogen in Ecuador (Original language)
Released: July 2023
Summary Points:
The roadmap outlines three development phases:
- Phase 1 (2023-2025): 0.1 MW of electrolysis capacity, 0.2 MW of renewables capacity.
- Phase 2 (2025-2030): 1 GW of electrolysis capacity, 2 GW of renewables capacity.
- Phase 3 (2030+): By 2040, 3 GW of electrolysis capacity, 6 GW of renewables capacity.
To achieve these goals, the roadmap identifies 31 high-level actions, which are distributed across four areas of focus (Research, Development and Innovation and Training; Rules and Regulations; Infrastructure; and International Cooperation).
January 2024