Project summary description:
This project developed optimal systems for the supply of hydrogen into industrial processes, including variable renewable electricity via PV and wind, hydrogen storage and battery storage. The cost of ‘reliable hydrogen’ at a range of locations was determined for present-day, 2030 and 2050 scenarios.