Network Maintenance and Optimisation
Background
Exbyte Team collaborates with water utilities to process recorded data and discover hidden patterns, in order to support oper-ational decision making. The project aims to dynamically optimise the network operation to meet key performance indicators for continuity of supply, quality, energy and costs.
Technologies
Water quality analysis
- Spatial-temporal analysis
- Water age estimation
- Impact of water age on water quality
- Impact of operational changes on water quality
Chemical dosing optimisation
- Water quality prediction
- Additional sites optimization
- Chemical dosing optimization
Energy saving at subsystem and whole system scales
- Factor analysis
- Joint optimization
- Demand prediction
- Risk analysis
Outcomes
- Water quality map of residual total chlorine level for the water distribution network.
- Predictive model of daily demand patterns for individual reservoir zones and the whole system .
- Optimised chlorine dosing strategy of volume and timing for water quality management.
- Impact of reservoir operational windows on water quality and energy management.
- Advanced operational protocol of reservoir pumping and valve controlling for energy management.
- Data requirements to improve certainty and optimisation for water quality and energy management.
Previous post:
Coming up next: